|
Click on images for a better view
|
|
|
|
|
|
|
Sealing foundation and pier setting at 153rd and Nall (Iron Horse Subdivision)
|
|
|
|
|
|
|
Tear out sidewalk and driveway and reinstall (before)
|
|
|
|
|
|
|
|
Tear out sidewalk and driveway and reinstall (after)
|
|
|
|
|
|
|
|
Grade backyard, install french drain and concrete patio (before)
|
|
|
|
|
Grade backyard, install french drain and concrete patio (working)
|
|
|
|
|
|
|
|
Grade backyard, install french drain and concrete patio (after) Customer to install sod
|
|
|